Upper Tama Koshi Hydropower Headworks Model Study

Upper Tama Koshi Hydropower Headworks Model Study

Research institute: Hydro Lab

This study had two objectives: 1) to test the sustainability of daily peaking reservoir by sediment flushing from weir gates; 2) to test the performance of headworks components such as intake, bed load sluice, trash sluice, and setting basins in respect of hydraulics and sediment

See more: