Devighat Intake Model Study
Research institution: Hydro Lab
The prime objective is to carry out a physical model test of Trishuli outlet for finding alternatives to abstract design discharge into Devighat conveyance system.
The achievements from the model test are: 1) to ensure that the storage in the upstream of the diversion weir is sustainable subject to proper headworks operation, and 2) to verify the satisfactory performance of the designed headworks with minor modifications.
Project Location: Lama Bagar, Eastern Nepal
Nature of Headworks Site: Boulder and gravel bed river
Project type: Daily peaking run-of- river 310 MW hydropower
Model Study Year: 2004 - 2005
Client: Nepal Electricity Authority
Consultant: Norconsult AS Norway
Model Scale: 1:60
Model type: Mobile bed and undistorted
See more: